
Cutoffs for Dams: (ICOLD Bulletins Series 150)
ICOLD Bulletin 150, Cutoffs for Dams, discusses foundation treatment methods using cutoff-type barriers. High emphasis is given to alluvial deposits throughout this document; however, different materials may require cutoff. The construction of cutoffs has made significant advances mainly through the development of more powerful machinery for drilling and excavation, but also through the introduction of new concepts and techniques, such as jet grouting and deep soil mixing. The following types of cutoffs are presented in this Bulletin: - Diaphragm walls- Vib walls- Pile walls- Superimposed concreted galleries- Jet grouting- Deep mixingThese methods are described, and the practical application of each method is illustrated by selected case histories. These case histories also demonstrate how certain difficulties specific to a particular dam site have been dealt with. The performance of cutoffs should be monitored so that their efficiency in reducing flow and piezometric head can be evaluated. Piezometers installed in the foundation upstream and downstream of the cutoff are needed to meet this objective.
£84.99
Similar Deals

Scrambles in Ulster and Connact Book
£12.99
From Jackson Sport

Pilgrim Paths in Ireland Book
£12.99
From Jackson Sport

A Guide to Irelands Mountain Summits Book
£13.99
From Jackson Sport

Best Irish Walks Book
£11.99
From Jackson Sport

Fair Head Climbing Guide Book
£26.00
From Jackson Sport

Mournes Walks Book
£8.99
From Jackson Sport

Avignon Soleil Book
£29.99
From Jackson Sport

Dalkey Quarry Book
£20.00
From Jackson Sport